The PDF documents listed below are the official versions and are exact replicas of the originals; they contain all Attachments and Temporary Change Requests (TCRs).  Signed originals are maintained by the Best Practices and Outreach Department. Print-out copies of the documents are considered UNCONTROLLED / Information Only Copies and must be marked as such.



Table of Contents

 [SKIP DIRECTLY TO A SECTION BY CLICKING ONE]
GEN-XXX General Procedures
ESH-XXX ES&H Procedures
EWM-XXX ER/WM Procedures
QA-XXX QA Procedures
ENG-XXX Engineering Procedures
PER-XXX Personnel Procedures
TR-XXX Training Procedures
MC-XXX Material Control Procedures
ACT-XXX Accounting Procedures
FAC-XXX
Facilities Procedures

GEN-XXX


GEN-001 " Cyber Security Policy TEMPORARY CHANGE REQUEST FORM Policy, Procedure, and Mission Statement Development, Review, and Approval Cyber Security Policy TEMPORARY CHANGE REQUEST FORM " Rev. 4
GEN-001, R4-TCR-002- Procedure with
Attachments 1 through 5
Effective Date:
1/1/14
Responsible Department Head:
Zelick
Status/Comments:
next review Apr 2020

GEN-003 "Document Distribution Control" Rev. 2
GEN-003,R2-TCR-004 - Procedure with
Attachment 1
Effective Date:
4/23/07
Responsible Department Head:
Zelick
Status/Comments:
next review May 2021

GEN-006 "Investigation and Follow-up of Adverse Events and Conditions (including Occurrence Reporting and Price Anderson Amendment Act Reviews)" Rev. 12
GEN-006,R12-TCR-001- Procedure with
Attachments 1 through 8
Effective Date:
9/28/17
Responsible Department Head:
White
Status/Comments:
next review Nov 2020

GEN-007 "Review and Implementation of Requirements (Laws, Regulations, Standards, Contract Clauses, DOE Directives, Procedures)" Rev. 4
GEN-007,R4-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
10/30/12
Responsible Department Head:
Zelick
Status/Comments:
next review Nov 2018

GEN-008 "Visit Notifications and Access Requirements" Rev. 8
GEN-008 - Procedure with
Attachments1 through 4
Effective Date:
7/30/18
Responsible Department Head:
Cohen
Status/Comments:
next review August 2021

GEN-009 "GPP Prioritization" Rev. 2
GEN-009,R2-TCR-003 - Procedure with
Attachment 1
Effective Date:
11/4/10 
Responsible Department Head:
Riccardo
Status/Comments:
next review Jun 2019

GEN-011 "ES&H Deficiency Reporting" Rev.3
GEN-011,R3-TCR-004
Effective Date:
9/15/06
Responsible Department Head:
Levine 
Status/Comments:
next review Aug 2021

GEN-014 "Small Business Innovative Research (SBIR) / Small Business Technology Transfer (STTR) Proposals " Rev. 2
GEN-014 - Procedure with
Attachment 1

Effective Date:
11/15/17
Responsible Department Head:
Fischer
Status/Comments:
next review Nov 2020

GEN-015 "Procedure for Research Sponsored by Non-DOE Entities" Rev. 5
GEN-015,R5-TCR-002
Effective Date:
1/31/17
Responsible Department Head:
Fischer
Status/Comments:
next review May 2021

GEN-023 "Records Management" Rev. 3
GEN-023 - Procedure with
Attachments 1 through 10
Effective Date:
6/6/14
Responsible Department Head:
Zelick
Status/Comments:
next review Feb 2018

GEN-027 "Obtaining Goods and Services from Contractor Affiliated Sources (Princeton University)" Rev. 0
GEN-027,R0-TCR-001 Procedure
Effective Date:
6/14/04 
Responsible Department Head:
Fischer
Status/Comments:
next review Jul 2019

GEN-028 "Approval of Used, Reconditioned or Remanufactured Equipment or Supplies Purchases" Rev. 0
GEN-028, R0-TCR-001 Procedure
Effective Date:
11/30/06 
Responsible Department Head:
Fischer
Status/Comments:
next review Mar 2020

GEN-031 "Publishing and Patent Clearance of Scientific and Technical Papers and Information " Rev. 0
GEN-031,R0-TCR-002 Procedure with
Attachments 1 through 3
Effective Date:
8/10/11
Responsible Department Head:
Zarnstorff
Status/Comments:
next review Jan 2016
Review date extended to 9/30/16

GEN-032 "Sharing PPPL Theory and Computation Department Codes with Researchers at Other Institutions" Rev. 1
GEN-032 Procedure with
Attachments 1 and 2
Effective Date:
2/13/15
Responsible Department Head:
Zarnstorff
Status/Comments:
next review Feb 2018

GEN-033 "PPPL Management Group and PPPL Advisory Board" Rev. 1
GEN-033 Procedure with
Attachment 1
Effective Date:
2/19/16
Responsible Department Head:
Brog
Status/Comments:
next review Feb 2019

GEN-034 "Sharing PPPL Engineering, Experimental and Analysis Codes with Researchers at Other Not-for-Profit Institutions" Rev. 1
GEN-034 Procedure with
Attachments 1 and 2
Effective Date:
2/13/15
Responsible Department Head:
Zarnstorff
Status/Comments:
next review Feb 2018

GEN-035 "Entering Into Memorandum Of Understanding (MOUs) With Foreign Partners" Rev. 1
GEN-035 Procedure with
Attachments 1-3
Effective Date:
6/22/17
Responsible Department Head:
Zarnstorff
Status/Comments:
next review June 2020

GEN-036 "Laboratory Directed Research and Development (LDRD)" Rev. 0
GEN-036,R0-TCR-001 Procedure with
Attachments 1 and 2
Effective Date:
3/14/14
Responsible Department Head:
Fischer
Status/Comments:
next review Dec 2019

GEN-037 "PPPL Invention Disclosure Procedure" Rev. 1
GEN-037, R1-TCR-001 Procedure with
Attachments 1 and 2
Effective Date:
5/12/17
Responsible Department Head:
Zarnstorff
Status/Comments:
next review June 2020


GEN-039 "Procedure for Identification, Handling and Storing Official Use Only Information" Rev. 0
GEN-039 Procedure with
Attachments 1 through 4
Effective Date:
6/2/16
Responsible Department Head:
White
Status/Comments:
next review Jun 2019

ESH-XXX


ESH-001 "Use of Safety, Accident Prevention, and Equipment Protection Tags" Rev. 3
ESH-001,R3-TCR-003 Procedure with
Attachments 1 and 2
Effective Date:
6/8/07
Responsible Department Head:
Levine 
Status/Comments:
next review May 2021

ESH-002 "Facility Safety Signs and Barricade Tapes" Rev. 5
ESH-002, R5-TCR-001 Procedure with
Attachments 1 through 3
Effective Date:
8/10/18
Responsible Department Head:
Levine 
Status/Comments:
next review Aug 2021

ESH-004 "Job Hazard Analysis" Rev. 7
ESH-004,R7-TCR-001
Effective Date:
2/7/17
Responsible Department Head:
Levine 
Status/Comments:
next review Mar 2021

ESH-013 "Non-Emergency Environmental Release-Notification and Reporting" Rev. 5
ESH-013,R5-001 -  Procedure with
Attachments 1 through 3
Effective Date:
3/6/15
Responsible Department Head:
Levine
Status/Comments:
next review Mar 2021

ESH-014 "National Environmental Policy Act (NEPA) Review System" Rev. 5
ESH-014,R5-TCR-002 Procedure with
Attachments 1 through 4
Effective Date:
11/14/14
Responsible Department Head:
Levine
Status/Comments:
next review June 2021

ESH-015 "Hazard Assessment by Emergency Response Zone" Rev. 1
ESH-015,R1-TCR-001 - Procedure with
Attachment 1
Effective Date:
8/15/08
Responsible Department Head:
White
Status/Comments:
next review Oct 2017

ESH-016 "Control of Hazardous Energy (Lockout/Tagout)" Rev. 6
ESH-016,R6-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
11/6/15
Responsible Department Head:
Riccardo
Status/Comments:
next review May 2020

ESH-024 "Management of Moratorium and Suspension Encumbered Metals" Rev. 0 - **Rescinded until further notice
**ESH-024,R0-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
11/9/15
Responsible Department Head:
Levine
Status/Comments:
next review May 2020

ESH-025 "Operations Hazard Classification Criteria and Safety Certification System" Rev. 1
ESH-025,R1-TCR-001 - Procedure with
Attachments 1 through 5
Effective Date:
9/8/2017
Responsible Department Head:
Levine
Status/Comments:
next review Mar 2021

EWM-XXX


EWM-001 "Hazardous Waste Management" Rev. 3
EWM-001,R3-TCR-004- Procedure with
Attachment 1
Effective Date:
12/6/05
Responsible Department Head:
  Levine
Status/Comments:
next review Jan 2021

EWM-004 "Satellite Accumulation Areas" Rev. 2
EWM-004, R2-TCR-001 - Procedure
Effective Date:
8/10/18
Responsible Department Head:
  Levine
Status/Comments:
next review Aug 2021

EWM-005 "Asbestos Management Services" Rev. 3
EWM-005, R3-TCR-002 - Procedure with
Attachment 1
Effective Date:
8/10/18
Responsible Department Head:
Levine
Status/Comments:
next review Aug 2021

EWM-007 "Air Environmental Permitting and Monitoring Program Requirements" Rev. 3
EWM-007,R3 - Procedure with
Attachments A through E
Effective Date:
2/9/2018
Responsible Department Head:
Levine
Status/Comments:
next review Feb 2021


EWM-008 "Management of Stratospheric Ozone Depleting Substances, Non-Exempt Refrigerants, and Associated Equipment" Rev. 0
EWM-008,R0 - Procedure with Attachments 1 through 6
Effective Date:
6/7/2018
Responsible Department Head:
Levine
Status/Comments:
next review June 2021

QA-XXX


QA-002 "Quality Assurance Audits" Rev. 10
QA-002, R10 - Procedure with
Attachments 1 through 2
Effective Date:
7/13/18
Responsible Department Head:
Tiwari
Status/Comments:
next review July 2021

QA-003 "Procurement Quality Assurance" Rev. 5
QA-003,R5 - Procedure with
Attachments 1 through 2
Effective Date:
1/31/18
Responsible Department Head:
Tiwari
Status/Comments:
next review Jan 2021

QA-004 "QA/QC Site Inspection and Oversight" Rev. 3
QA-004,R3 - Procedure with
Attachments 1 and 2
Effective Date:
1/31/18
Responsible Department Head:
Tiwari
Status/Comments:
next review Jan 2021

QA-005 "Control of Nonconformances" Rev. 5
QA-005,R5 - Procedure with
Attachments 1 through 4
Effective Date:
1/31/18
Responsible Department Head:
Tiwari
Status/Comments:
next review Jan 2021

QA-012 "Corrective Action Request" Rev. 3
QA-012, R3 - Procedure with
Attachment 1
Effective Date:
1/31/18
Responsible Department Head:
Tiwari
Status/Comments:
next review Jan 2021

QA-017 "PPPL Issues Tracking System" Rev. 6
QA-017,R6-TCR-001 - Procedure
Effective Date:
7/23/14
Responsible Department Head:
Zelick
Status/Comments:
next review March 2018

QA-019 " Root Cause Analysis/Extent of Condition Analysis " Rev. 5
QA-019,R5-TCR-001 - Procedure with
Attachments 1 through 9
Effective Date:
10/22/12
Responsible Department Head:
Tiwari
Status/Comments:
next review Aug 2018

QA-020 "Suspect & Counterfeit Items Control and Dispositioning" Rev. 2
QA-020, R2-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
3/11/16
Responsible Department Head:
Tiwari
Status/Comments:
next review May 2020

QA-023 "Design and Improvement of Processes" Rev. 2
QA-023-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
11/14/14
Responsible Department Head:
Zelick
Status/Comments:
next review Nov 2020

QA-025 "Management Assessments" Rev. 2
QA-025,R2 - Procedure with
Attachments 1 through 3
Effective Date:
7/13/18
Responsible Department Head:
Tiwari
Status/Comments:
next review July 2021

ENG-XXX


ENG-002 "Control of Measuring Test Equipment and Calibration" Rev. 3
ENG-002,R3 - Procedure
with Attachment 1
Effective Date:
2/12/18
Responsible Department Head:
Riccardo
Status/Comments:
next review February 2021
 

ENG-005 "General Plant Projects Administration" Rev. 3
ENG-005,R3-TCR-001 - Procedure
Effective Date:
11/4/10
Responsible Department Head:
Riccardo
Status/Comments:
next review Jun 2019

ENG-006 "Preparation, Review & Approval of Technical Specifications" Rev. 8
ENG-006,R8 - Procedure with
Attachment 1
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-007 "Reliability, Availability, and Maintainability (RAM) Modeling and Apportionment" Rev. 1
ENG-007,R1-TCR-003 - Procedure with
Attachments 1 and 2
Effective Date:
11/30/11
Responsible Department Head:
Riccardo
Status/Comments:
next review Mar 2021

ENG-008 "Failure Modes and Effects Analysis"Rev. 1
ENG-008,R1 - Procedure with
Attachments 1 through 3
Effective Date:
4/27/2018 
Responsible Department Head:
Riccardo
Status/Comments:
next review April 2021

ENG-009 "Electric Service Load Reduction" Rev. 3
ENG-009,R3-TCR-002 - Procedure
Effective Date:
2/12/09
Responsible Department Head:
Riccardo
Status/Comments:
next review Dec 2020

ENG-010 "Control of Drawings" Rev. 8
ENG-010,R8 - Procedure with
Attachments 1 through 4
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-011 "Interlock Key Control" Rev. 3
ENG-011 - Procedure with
Attachment 1
Effective Date:
7 /27/04
Responsible Department Head:
Riccardo
Status/Comments:
next review Jun 2019

ENG-012 "Identification & Control of Items"Rev. 1
ENG-012, R1 Procedure
Effective Date:
1/31/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Jan 2021

ENG-014 "Hydrostatic and Pneumatic Testing" Rev. 4
ENG-014,R4-001 - Procedure with
Attachments 1 through 4
Effective Date:
12/19/14
Responsible Department Head:
Riccardo
Status/Comments:
next review Mar 2021

ENG-016 "Preventive Maintenance & Surveillance Program (Experimental)" Rev. 5
ENG-016 - Procedure with
Attachment 1
Effective Date:
6/29/18
Responsible Department Head:
Riccardo
Status/Comments:
next review June 2021

ENG-019 "PPPL Engineering Standards" Rev. 4
ENG-019, R4-TCR-001 - Procedure
Effective Date:
10/24/14
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2020

ENG-020 "Project Execution Plan" Rev. 1
ENG-020,R1-TCR-003- Procedure with
Attachment 1
Effective Date:
3/11/05
Responsible Department Head:
Riccardo
Status/Comments:
next review  June 2019

ENG-021 "Program for Hoisting & Rigging, Forklifts, Manlifts, Special Purpose Vehicles, Utility Vehicles and Portable Equipment " Rev. 5
ENG-021,R5-TCR-002 - Procedure
Effective Date:
11/20/13
Responsible Department Head:
Riccardo
Status/Comments:
next review Sept 2020

ENG-022 "Scheduled Site Power Outage Notification" Rev. 1
ENG-022,R1-TCR-003 - Procedure with
Attachments1 and 2
Effective Date:
3/2/99 
Responsible Department Head:
Riccardo
Status/Comments:
next review July 2020

ENG-023  "Electrical Equipment Approval ISM Guide for RevCom " Rev. 1
ENG-023,R1-TCR-001 - Procedure with
Attachments 1 through 5
Effective Date:
6/2/16
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2020

ENG-024 "Digging Permits" Rev. 4
ENG-024,R4-TCR-001 - Procedure with
Attachment 1
Effective Date:
10/3/14
Responsible Department Head:
Riccardo
Status/Comments:
next review Jun 2018

ENG-025 "Impairments of Fire Dampers and Fire Doors" Rev. 4
ENG-025- Procedure with
Attachments 1 through 3
Effective Date:
8/7/15
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2018

ENG-026 "Fire and Life Safety Systems" Rev. 4
ENG-026,R4-TCR-002 - Procedure
Effective Date:
3/7/11
Responsible Department Head:
Carle
Status/Comments:
next review May 2020




ENG-030 "PPPL Technical Procedures" Rev. 6
ENG-030,R6-TCR-002- Procedure with
Attachments 1 through 9
Effective Date:
1/31/18
Responsible Department Head:
Riccardo
Status/Comments:
next review May 2021

ENG-032 "Work Planning Procedure" Rev. 9
ENG-032,R9- Procedure with
Attachment 1
Effective Date:
1/31/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Jan 2021

ENG-033 "Design Verification" Rev. 7
ENG-033,R7- Procedure with Attachments 1 through 11
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-034 "Cyber Security Incident Response" Rev. 3
ENG-034,R3
Effective Date:
2/10/17
Responsible Department Head:
Cohen
Status/Comments:
next review Feb 2020

ENG-036 "Control of Temporary Modifications" Rev. 1
ENG-036,R1 - Procedure with
Attachment 1
Effective Date:
1/31/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Jan 2021

ENG-037 "General Welding and Brazing Requirements" Rev. 3
ENG-037 - Procedure with
Attachments 1 through 6
Effective Date:
2/26/13
Responsible Department Head:
Riccardo
Status/Comments:
next review Feb 2019

ENG-038 "Welding Materials Control" Rev. 0
ENG-038,R0-TCR-003 - Procedure
Effective Date:
6/10/05 
Responsible Department Head:
Riccardo
Status/Comments:
next review Jul 2020

ENG-039 "Computer Center Work Control" Rev. 2
ENG-039 - Procedure with
Attachment 1
Effective Date:
8/28/15
Responsible Department Head:
Cohen
Status/Comments:
Aug 2018

ENG-040 "AC Power Switching Orders" Rev. 0
CANCELLED PROCEDURE - Superseded by ACPS-P-24, R1


ENG-041 "Electrician Qualification" Rev. 0
ENG-041,R0-TCR-004 - Procedure with
Attachment 1
Effective Date:
1/22/09
Responsible Department Head:
Riccardo 
Status/Comments:
next review Sept 2020

ENG-042 "Boiler Operator Qualification" Rev. 0
ENG-042,R0-TCR-003 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Riccardo 
Status/Comments:
next review Feb 2019

ENG-043 "Carpenter Qualification" Rev. 0
ENG-043,R0-TCR-003 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Riccardo 
Status/Comments:
next review Sept 2020

ENG-044 "HVAC Mechanic Qualification" Rev. 0
ENG-044,R0-TCR-003 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Riccardo
Status/Comments:
next review Feb 2019

ENG-045 "Apprentice Machinist and Qualified Machinist Qualification" Rev. 2
ENG-045,R2-TCR-001 - Procedure with
Attachments 1 through 6
Effective Date:
10/23/15
Responsible Department Head:
Riccardo
Status/Comments:
next review Mar 2021

ENG-046 "Metal Fabricator Qualification" Rev. 0
ENG-046,R0-TCR-004 - Procedure with
Attachment 1
Effective Date:
3/20/09
Responsible Department Head:
Riccardo
Status/Comments:
next review Mar 2021

ENG-047 "Facilities Technician Qualification" Rev. 0
ENG-047,R0-TCR-002 - Procedure with
Attachment 1
Effective Date:
11/24/09
Responsible Department Head:
Riccardo
Status/Comments:
next review Jul 2018

ENG-048 "Machine/Carpenter Shop Equipment Safety Checklists" Rev. 0
ENG-048 - Procedure with
Attachments 1-12
Effective Date:
6/25/10
Responsible Department Head:
Riccardo
Status/Comments:
next review Nov 2020

ENG-049 "Project Status and Oversight" Rev. 0
ENG-049,R0-TCR-001 - Procedure with
Attachment 1
Effective Date:
6/24/10
Responsible Department Head:
Riccardo
Status/Comments:
next review May 2019

ENG-050 "Job Requirements Documentation and Control" Rev. 3
ENG-050 - Procedure with
Attachment 1
Effective Date:
1/31/18
Responsible Department Head:
Riccardo
Status/Comments:
next review 2021

ENG-051 "Facilities and Infrastructure Mission Readiness" Rev. 0
ENG-051 - Procedure with
Attachments 1 through 4
Effective Date:
7/2/10
Responsible Department Head:
Carle
Status/Comments:
next review Dec 2017

ENG-052 "Operating Expense (OPEX) Projects Prioritization and Administration" Rev. 0
ENG-052 - Procedure with
Attachments 1 and 2
Effective Date:
7/2/10
Responsible Department Head:
Carle
Status/Comments:
next review Feb 2018

ENG-053 "Job Cost Estimate Development & Review" Rev. 0
ENG-053,R0-TCR-003 - Procedure
Effective Date:
11/17/10
Responsible Department Head:
Riccardo 
Status/Comments:
next review July 2020

ENG-055 "Conduct of Operations" Rev. 1
ENG-055,R1-001 - Procedure with
Attachment 1
Effective Date:
8/7/15
Responsible Department Head:
Riccardo
Status/Comments:
next review May 2021

ENG-057 "Project and Governance Roles and Responsibilities" Rev. 3
ENG-057, R3 - Procedure
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-058 "Davis-Bacon Screening" Rev. 0
ENG-058,R0-TCR-001 - Procedure with
Attachments 1 and 2
Effective Date:
5/16/12
Responsible Department Head:
Riccardo
Status/Comments:

next review Jun 2018

ENG-059 "Process Plan/Traveler for PPPL Built Components" Rev. 0
ENG-059,R0 - Procedure with
Attachment 1

Effective Date:
1/31/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Jan 2021

ENG-060 "Preparation, Review & Approval of Statements of Work" Rev. 1
ENG-060, R1 - Procedure with
Attachments 1 through 2

Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-061 "Engineering Design Document and Record Numbering" Rev. 0
ENG-061, R0 - Procedure
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-062 "Planning and Performing Tests" Rev. 0
ENG-062, R0 - Procedure with
Attachments 1 through 2
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-063 "System Breakdown Structure and Categorization" Rev. 0
ENG-063, R0 - Procedure with
Attachments 1 through 2
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

ENG-064 "Interface Control" Rev. 0
ENG-064, R0 - Procedure with
Attachments 1 through 3
Effective Date:
8/1/18
Responsible Department Head:
Riccardo
Status/Comments:
next review Aug 2021

PER-XXX


PER-006 "PPPL Guided Tour Program and Escort Responsibilities" Rev.3
PER-006,R3-TCR-003 - Procedure with
Attachments 1 through 3
Effective Date:
7/20/04
Responsible Department Head:
Zwicker
Status/Comments:
next review Feb 2018

TR-XXX


TR-001 "Laboratory Training Program" Rev. 4
TR-001,R4-TCR-001- Procedure
Effective Date:
1/18/10
Responsible Department Head:
Moten
Status/Comments:
next review June 2020

TR-005 "Instructor Qualification and Requalification" Rev. 2
TR-005 - Procedure with
Attachments 1 through 4
Effective Date:
1/18/10
Responsible Department Head:
Moten
Status/Comments:
next review June 2020

TR-006 "Establishing Qualification and Certification Requirements" Rev. 2
TR-006 - Procedure with
Attachments 1 through 9
Effective Date:
1/18/10 
Responsible Department Head:
Moten
Status/Comments:
next review June 2020

TR-007 "Guidelines for Developing Training Matrices" Rev. 3
TR-007 - Procedure with
Attachment 1
Effective Date:
9/30/13
Responsible Department Head:
Moten
Status/Comments:
next review Oct 2019

MC-XXX


MC-001 "Control of Government-Owned Personal Property" Rev. 3
MC-001 - Procedure with
Attachments 1 and 2
Effective Date:
2/11/17
Responsible Department Head:
Levine
Status/Comments:
next review Feb 2020

MC-002 "Loan of Government Personal Property from PPPL to a Foreign entity and Associated Foreign Transactions for Government Personal Property" Rev. 5
MC-002 Procedure with
Attachments 1 through 7
Effective Date:
4/26/2018
Responsible Department Head:
Levine
Status/Comments:
next review Apr 2021

MC-003 "DOE Mission Movement (Collaboration) and Loan of Government Personal Property from PPPL to a Domestic entity" Rev. 7
MC-003 - Procedure with
Attachments 1 through 6
Effective Date:
3/16/18
Responsible Department Head:
Levine
Status/Comments:
next review Mar 2021

MC-004 "Acquisition and Disposal of Excess Government Property" Rev. 2
MC-004,R2
Effective Date:
1/31/17
Responsible Department Head:
Levine
Status/Comments:
next review Feb 2020

MC-005 "Shipment of Equipment, Materials and Supplies to Off-Site Location" Rev. 4
MC-005 - Procedure with
Attachment 1
Effective Date:
6/16/17
Responsible Department Head:
Levine
Status/Comments:
next review Jun 2020

MC-006 "Equipment and Materials Held for Future Projects Storage and Review" Rev. 4
MC-006 - Procedure with
Attachment 1
Effective Date:
9/25/17
Responsible Department Head:
Levine
Status/Comments:
next review Sep 2020

MC-007 "Property Pass Procedures" Rev. 5
MC-007,R5-001 - Procedure with
Attachments 1 through 2
Effective Date:
10/6/17
Responsible Department Head:
Levine
Status/Comments:
next review Mar 2021

MC-008 "Reporting Loss, Damage, or Destruction of Government Property" Rev. 1
MC-008,R1
Effective Date:
2/16/17 
Responsible Department Head:
Levine
Status/Comments:
next review Feb 2020

MC-009 "Adding Material to Stores Inventories" Rev. 1
MC-009,R2
Effective Date:
1/31/17
Responsible Department Head:
Levine
Status/Comments:
next review Feb 2020

MC-010 "Withdrawal of Stores Material" Rev. 1
MC-010,R1-TCR-003 - Procedure with
Attachment 1
Effective Date:
6/15/04 
Responsible Department Head:
Levine
Status/Comments:
next review Aug 2019


MC-011 "Requisition of Office Material and Supplies" Rev. 2
MC-011,R2-TCR-002 - Procedure with
Attachment 1
Effective Date:
3/14/08
Responsible Department Head:
Levine
Status/Comments:
new review Sep 2019

MC-012 "Withdrawal, Maintenance and Review of Spare Parts" Rev. 2
MC-012 Procedure with
Attachment 1
Effective Date:
8/10/17
Responsible Department Head:
Levine
Status/Comments:
next review Aug 2020

MC-013 "Export Control" Rev. 2
MC-013, R2-TCR-002 Procedure with
Attachments 1 through 6
Effective Date:
2/24/16
Responsible Department Head:
  Levine
Status/Comments:
next review June 2021

ACT-XXX


ACT-003 "Foreign Travel" Rev. 1
ACT-003,R1-001
Effective Date:
2/17/17
Responsible Department Head:
Fischer
Status/Comments:
next review Sept 2020

ACT-011 "Travel Planning and Approval for Conference Attendance" Rev. 2
ACT-011 Procedure with
Attachments 1 through 4
Effective Date:
5/17/16
Responsible Department Head:
Fischer
Status/Comments:
next review May 2019

ACT-012 "Planning and Approval for Conference Sponsorship" Rev. 0
ACT-012 Procedure with
Attachments 1 through 6
Effective Date:
5/20/16
Responsible Department Head:
Fischer
Status/Comments:
next review May 2019

FAC-XXX


FAC-006 "Penetrations" Rev. 0
FAC-006,R0
Effective Date:
3/29/18
Responsible Department Head:
Carle
Status/Comments:
next review Mar 2021

click on this image to go to the PPPL Local home page  home

This page is maintained by: Aileen Pritch

This page last revised by Tashieka Brewer 8/15/18